Self-service Reports

See exactly what you receive before you pay.

Every report is generated instantly from the inputs you provide — no consultant, no waiting. Start free and upgrade only when you need deeper analysis.

Analyse a Property →
Free

Development Opportunity Snapshot

A preliminary read on any plot or building. Generated from your inputs — no documents, no waiting. Find out whether the opportunity is worth investigating further before spending anything.

Free
forever
Instant
delivery
2–3 pages
report length
Start Free →
Included
  • ✓Opportunity score (0–100)
  • ✓3 key strengths from your inputs
  • ✓3 risks flagged immediately
  • ✓Data completeness indicator
  • ✓Missing information list
  • ✓Preview of what paid reports add
Not in this level
  • –FSI calculations
  • –TDR analysis
  • –Cost or revenue model
Most popular
Screen

Instant Development Potential Screen

Full development potential analysis across all applicable DCPR 2034 regulation routes. Shows what can be built, what TDR applies, key regulatory flags — without requiring any documents.

₹4,999
one-time
Instant
delivery
8–12 pages
report length
Get This Report →
Included
  • ✓Applicable regulation routes (from 14 possible)
  • ✓Indicative FSI range for your plot
  • ✓Development potential estimate (BUA sqm)
  • ✓Key regulatory flags — road width, reservations, zone
  • ✓Top 5 risks and 5 opportunities
  • ✓Confidence rating per calculation
  • ✓8–12 page PDF delivered instantly
Not in this level
  • –Detailed cost model
  • –Revenue analysis
  • –Margin calculation
Detailed

Detailed Development Potential Report

Every FSI, TDR, and premium calculation shown with full workings. Comparative scenarios across regulation routes. The report a serious developer or architect uses before committing capital.

₹14,999
one-time
Instant
delivery
15–25 pages
report length
Get This Report →
Included
  • ✓Detailed FSI calculation with all components
  • ✓TDR entitlement and acquisition cost
  • ✓Premium calculations (fungible, additional FSI)
  • ✓Comparative scenarios — best 3 regulation routes
  • ✓Risk and opportunity matrix
  • ✓Missing information list and its impact
  • ✓Calculation notes and assumption register
  • ✓15–25 page PDF delivered instantly
Not in this level
  • –3-scenario financial model
  • –Go/No-Go indicator
Most comprehensive
Commercial

Commercial Feasibility & Risk Report

A complete commercial feasibility study with three development scenarios, full cost and revenue model, sensitivity analysis, and a Go / Conditional Go / No-Go indicator.

₹34,999
one-time
Instant
delivery
25–40 pages
report length
Get This Report →
Included
  • ✓Everything in the Detailed report
  • ✓3 development scenarios with different assumptions
  • ✓Full project cost model (construction, TDR, premiums, BMC, finance)
  • ✓Revenue model by unit type and sale rate
  • ✓Margin and break-even analysis
  • ✓Sensitivity matrix — 15 scenarios
  • ✓Go / Conditional Go / No-Go indicator with rationale
  • ✓Per-member benefit breakdown (society projects)
  • ✓25–40 page PDF delivered instantly
How it works

Your inputs become a report in minutes.

1
Enter what you know
Plot area, location, existing building, your objective. No documents needed at this stage.
2
Engine runs all routes
14 DCPR 2034 regulation routes calculated simultaneously against your plot.
3
Report generated
Instant PDF with calculations, flags, and scenarios specific to your inputs.
4
Upgrade if needed
Pay only the difference to move from a lower to a higher report level.

Reports are generated from information entered by the user and version-controlled calculation rules derived from DCPR 2034 and current MCGM circulars. Every report identifies assumptions, missing information, confidence level, and matters requiring professional verification. Reports do not constitute legal advice, architectural certification, or a formal feasibility opinion. Upgrade pricing: pay only the difference when moving to a higher report level.

Start with the free snapshot.

No account. No document upload. Instant results.

Analyse a Property →